Skip navigation

Contract 201951576 2019 Neighborhood Sidewalk Repairs, Phase 1

General Statement of Work:

Contractor will go into neighborhood regions designated by the City and repair concrete or flagstone sidewalk that has been identified by City personnel as non-compliant with City codes. Repairs may include slab leveling, joint grinding or stone replacement. Landscape/irrigation system protection/replacement and traffic/pedestrian control are ancillary to the contract and will be paid for separately. It is estimated that 20% of this contract’s work will be performed Citywide and 80% in the sidewalk repair district. 

Estimated Construction Cost:

The estimated cost of construction for this project is between $900,000.00 and $1,100,000.00. 

Statement of Quantities (PDF)

Pre-Bid Conference on September 3, 2019 at 1:00 p.m.

Webb Building

201 W Colfax Ave

4th Floor Conference Room 4.I.4.

Denver, CO 80202

Sign-in Sheet (PDF)

Questions Deadline:

September 10, 2019 at 10:00 a.m., local time 

Bid Opening on September 19, 2019 at 11:00 a.m.

Webb Building

201 W Colfax Ave

6th Floor Conference Room 6.G.7.

Denver, CO  80202 

Plans Available August 27, 2019

Digital Download

QuestCDN Project #6494704

Plan Cost: $15.00 

SBE Goal: 10%  

Contract Administrator: Jennifer Clark

pw.procurement@denvergov.org 

For complete description, see ad in The Daily Journal on the following dates:

August 27, 28, 29, 2019