Contract 201851838 35th St & Lincoln Park Sanitary Improvements

General Statement of Work

This is a Sanitary Sewer Project regarding deteriorated gravity drained sewer pipes, designed for use of Wastewater Management Division approved, Cured-In-Place-Plastic Pipe or Formed-In-Place Pipeliner Methods of Construction, which are methods of sewer pipe rehabilitation that are cost effective and consistently allow significantly shorter construction time in comparison to open trench method of construction. Since no excavation is required, utilities and traffic conflicts are minimized, thereby citizen discomfort and complaints are reduced to minimum. This Lining Project is located in 35th Street/Avenue.

Addendum #1 (PDF)

Addendum #2 (PDF)

Addendum #3 (PDF)

Estimated Construction Cost

Between $1,850,000.00 and $2,250,000.00

Statement of Quantities (PDF)

Pre-Bid Meeting on October 18, 2019 at 9:00 AM

WEBB Building

201 West Colfax Avenue

4th Floor Conference Room 4.I.5

Denver, Colorado 80202

Sign-in Sheet (PDF)

Questions Deadline

October 25, 2019 at 10:00 AM local time

NEW BID OPENING DATE: December 5, 2019 at 11:00 AM

Bid Opening on November 7, 2019 at 11:00 AM

WEBB Building

201 West Colfax Avenue

6th Floor Conference Room 6.G.7

Denver, CO 80202

Plans Available October 7, 2019

Digital Download

Quest Project: #6517902

Plan Cost: $15.00

M/WBE goal: 10%

The MWEDSBE and Contract Management System (B2G) has a complete listing of City certified MWBE Firms at https://denver.mwdbe.com. Note: The inclusion of a firm on this list is for informational purposes only and does not constitute an endorsement of any contractor, manufacturer, or supplier.

Prequalification

1E(2) - SEWER REHABILITATION at or above the $3,000,000 monetary level

Contract Administrator

Katie Ragland

PW.Procurement@denvergov.org

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES

Monday, November 18, 2019

Tuesday, November 19, 2019

Wednesday, November 20, 2019