Skip navigation

Contract 201952435 Marion Street System, Phase 1

General Statement of Work

This storm drainage project extending along Marion Street Corridor from MLK Blvd. to E. 27th Ave. (five city blocks) will connect the upstream end of the 33rd Street Outfall system at MLK Blvd. The majority of the work consists of open cut construction of 8' x 8' concrete boxes and relocation of a 6" waterline. Other areas of work include surface restoration in asphalt paving, in concrete sidewalks, and in curb ramps. Green infrastructure (Streetside Stormwater Planters) is also part of other areas of work to enhance water quality.

Estimated Construction Cost

Between $6,500,000.00 and $7,200,000.00

Statement of Quantities (PDF)

Pre-Bid Conference on November 21, 2019 at 9:00 a.m.

Webb Building

201 West Colfax Avenue

4th Floor Conference Room 4.I.4.

Denver, CO 80202

Sign-in Sheet (PDF)

Questions Deadline

December 5, 2019, 10:00 a.m. local time

Bid Opening Date on January 16, 2020, 11:00 a.m. local time

Webb Building

201 West Colfax Avenue

6th Floor Conference Room 6.G.7.

Denver, CO  80202

Plans Available November 13, 2019

Digital Download

QuestCDN Project # 6572982

Plan Cost: $15.00

M/WBE Goal

17% MWBE

Prequalification

1E(4) Piped Sewer at or above the $9,000,000.00 monetary level in

Contract Administrator

Jennifer Clark

pw.procurement@denvergov.org

Published in The Daily Journal on the following dates:

November 13, 14, 15, 2019