Contract 202053562 Harvey Park - Irrigation Renovations Phase II & Gap Sidewalk

Elevate Denver is a 10-year, $937 million general obligation bond program approved by voters in 2017, that will enhance the City and County of Denver by providiing critical improvements to the City's infrastructure — improving our roads, sidewalks, parks, recreation centers, libraries, cultural centers, public-owned buildings and safety facilities.  More information can be found at www.denvergov.org/elevatedenver.

General Statement of Work

This irrigation improvements project is necessitated by conversion of the existing potable water irrigation system to a new raw water system drawn from Harvey Park Lake and replenished by water from the Ward Reservoir #5. A new pump house and associated piping, and lake interconnect. The irrigation system will include: providing, installing, and energizing the pumps; constructing pump house and providing connections and controls; install mainline and lateral piping, controllers, valves, and heads to irrigate the entire park. Construct approximately 10,500 sq. ft. of 5' attached walk along W. Evans Ave. street frontage; remove 2 existing curb cuts for the access to existing maintenance trail and reconstruct 10' wide curb cuts at the same location. Remove and replace existing signage.

Addendum #1 (PDF)

Estimated Construction Cost

Between $1,500,000.00 and $1,800,000.00

Statement of Quantities (PDF)

Pre-bid Meeting on February 21, 2020 at 10:00 a.m.

WEBB Building          

201 W. Colfax Avenue

4th Floor Conference Room, 4.I.5

Denver, CO 80202

Sign-in Sheet (PDF)

Questions Deadline

February 28, 2020 at 10:00 a.m. local time

Bid Opening on March 19, 2020 at 11:00 a.m.

WEBB Building

201 W. Colfax Avenue

6th Floor Conference Room 6.G.7

Denver, CO 80202

Plans Available February 12, 2020

Digital Download

QuestCDN Project #6717426

Plan Cost  $15.00

M/WBE goal: 10%

Prequalification

1C(1) LANDSCAPE IMPROVEMENTS at or above the $3,000,000.00 monetary level.

Contract Administrator

Regina Diaz

pw.procurement@denvergov.org

Prevailing Wage and Minimum Wage:  Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C.  City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:

Wednesday, February 12, 2020

Thursday, February 13, 2020

Friday, February 14, 2020