General Statement of Work

Schedule A - Is located along four blocks of Marion Street between the intersections of Marion Street at East Bayaud Avenue and Marion Street at East Virginia Avenue. The project will remove the existing pavement striping through the project limits, including the existing striped bike lane. The project will install striping, tubular markers, and cast-in-place concrete curbs for the new bike lane configuration which will relocate the bike lanes to the inside curb lines and include a bike lane buffer. The street signing will be revised throughout the project to meet current city standards. Traffic control will be required along the project during construction.

Schedule B - Remove existing bikelane markings, and signage from 21st to 36th Ave on Central Park Boulevard, re-stripe new protected bikeway, install verticle delineator posts, and curb stops, install new signage to enhance cyclist safety.

Schedule C - Will perform the construction of protected bike lanes and traffic calming measures to support two-way bicycle travel on W 23rd Ave and Water St from Federal Blvd to Speer Blvd (0.85mile). The improvements include bike lanes with a dedicated and protected space for bike travel at street level, using a variety of methods for physical protection from passing traffic. Improvements include: bicycle facility elements, signage and striping, vertical separation (flex posts and rubber curbs), refinement of street usage and geometrics. All improvements will be constructed to current CCD and ADA standards and specifications.

Estimated Construction Cost

Between $1,070,000.00 and $1,300,000.00

Statement of Quantities (PDF)

Pre-bid Meeting on September 29, 2020 at 11:30 a.m.

To access the meeting, please call 720-388-6219 and enter the conference ID: 516 093 636#.

Meeting Agenda (PDF)

Questions Deadline

October 13, 2020 at 10:00 a.m. local time

Bid Opening on November 5, 2020 at 11:00 a.m.

Bids will be received and accepted via the online electronic bid service, www.QuestCDN.com. To access the meeting, please call 720-388-6219 and enter the conference ID: 604 038 932#.

Plans Available September 21, 2020

Digital Download

QuestCDN Project #7307843

Plan Cost  $15.00

MWBE goal:  15%

Prequalification

1F(3) Concrete Sidewalk, Curb, Gutter, and ADA Ramps at or above the $1,500,000 monetary level.

Contract Administrator

Isabelle Oldani

pw.procurement@denvergov.org 

Prevailing Wage and Minimum Wage:  Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C.  City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.