Skip navigation

Contract No. 202054547 14th Ave Bridge Replacement Over Cherry Creek and Cherry Creek Trail

General Statement of Work

This project is the construction phase to remove and replace the 14th Avenue bridge over Cherry Creek and Cherry Creek Trail and traffic signal upgrades at the intersections of 14th Avenue and NB and SB Speer Blvd. Work will include demo of the existing bridge, earthwork, construction of a new bridge, and installation of a raised cycle track on the new bridge. In addition, the signal upgrades at the two intersections includes demo of the existing signal equipment, demo of the existing curb ramps, installation of upgraded signal equipment, construction of new curb ramps, and associated landscaping. Traffic control and erosion control will be ongoing components of the project.

Statement of Quantities (PDF)

Estimated Construction Cost

Between $4,100,000.00 and $4,500,000.00

Virtual Pre-Bid Meeting on May 12, 2020 at 1:00 p.m.

To access the meeting, please call 720-388-6219 and enter the conference ID: 516-093-636#.

Sign-in Sheet (PDF)

Questions Deadline

May 21, 2020 at 10:00 a.m. local time

Bid Opening on June 11, 2020 at 11:00 a.m.

Bids will be received and accepted via the online electronic bid service, www.QuestCDN.com. The call-in information will be provided to plan holders via QuestCDN the day before the bid opening is held.

Plans Available April 29, 2020

Digital Download

QuestCDN Project: #7031032

Plan Cost: $15.00

M/WBE goal:  21%

Prequalification

1G(1) Major Bridge Work at or above the $6,000,000.00 monetary level.

Contract Administrator

Katie Ragland

pw.procurement@denvergov.org 

Prevailing Wage and Minimum Wage:  Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C.  City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:

Thursday, April 30, 2020

Friday, May 1, 2020

Monday, May 4, 2020