Skip navigation

Pre Bid Meeting - Contract No. 201846136

Dec 13 2018 - Dec 13 2018

Start Time: 2:00 p.m.
End Time: 3:00 p.m.
Location: Webb Building, Room 4.G.4
201 W. Colfax Ave.
Denver, CO 80202

Federal AID Project No. AQC M320-091 SA 20300

This project will improve the signal system control by furnishing and installing system software and equipment, signal equipment (signal controllers, cabinets, line conditioning UPS's, hubs, etc.), communication devices, and communication media for signal system projects. Signalized intersections will be upgraded in the area of Tamarac Street (from E. Girard Ave. to E. Dartmouth Ave.), Quebec St. (from Cherry Creek Drive to 14th Ave and from 17th to 56th), Valentia/56th, Monaco St. (from MLK to 17th and from 14th to Virginia), MLK Blvd. (Roslyn to Iola), Smith Rd./Rosemary, 29th Ave. (Havana to Iola), Havana St. (40th to 51st), Florence/56th, Peoria St. (Smith to 51st), Chambers Rd. (40th to 53rd), Tower Rd. (43rd to 56th), Pena/Tower both north and south ramps, 48th Ave. (Argonne to Himalaya), Yosemite/Eastman/Syracuse Way, Syracuse Way/Wabash/Xeric Ct., Pena/56th both east and west ramps, Leetsdale Dr. (Alameda to Oneida), and Mississippi/Parker. Intersections may be added or subtracted based on design issues, other projects in the project area, or budget issues.

Question Deadline on December 20, 2018 at 10:00 a.m.

Website >>

Add to Calendar >>