Skip navigation

2018 Project Archive

See highlights from projects completed by Public Works in 2018. For information on projects completed prior to 2014, please contact Public Works Communications at pw.comms@denvergov.org.

19th & 20th Avenues Conversion

19th Avenue and 20th Avenue were converted to two-way travel on both streets through the North Capitol Hill/Uptown area, between approximately Broadway and Park Avenue West. The emergence of multi-family residences, street-level retail, restaurants, offices, and ongoing development in the area has changed the community, and this project will help reflect this change. 

New bicycle facilities were added on both 19th and 20th Avenues, and Grant and Logan Streets were also be converted to two-way vehicular operation between 18th and 20th Avenues. 

Read more about the 19th-20th Conversion Project

 
 
Cherry Creek South Drive Corridor - Phase III

This project rebuilt the third and final half-mile segment of Cherry Creek South Drive, completing the vision for the corridor that began in 2000.

The new stretch includes new concrete pavement, curb, gutter and sidewalks, with medians, street amenities and intersection enhancements to improve public safety and provide an enhanced experience for all modes of travel. The on-street parking lane uses permeable pavements to control stormwater and runoff.

Read more about Cherry Creek South Drive projects and phases

SH30 Hampden/Havana Pedestrian Safety Connections Improvements Project

This project addressed pedestrian safety along Hampden Avenue and Havana Street from approximately Dayton Street to Dartmouth Avenue. Denver Public Works and CDOT coordinated to add new sidewalk, landscaping and connections to the Cherry Creek Trail within the right of way to improve access near the trail and golf course.

Read more about the project features

 

Map of project area along E. Hampden Ave to Havana St, adjacent to Cherry Creek Trail and John F Kennedy Golf Course and Hentzell Park; cut fill areas and proposed concrete walked marked on west side of Havana north of Dartmouth and east side of Hampden to the south

 
Stormwater Infrastructure Projects

East Yale Avenue Storm Drain

The project addressed frequent flooding in the University Hills neighborhood in southeast Denver, at the geographic low point in S. Glencoe Street south of E. Yale Avenue. This location was identified as a Significant Flooding Location in the City’s Storm Drainage Master Plan. The project will improve the storm infrastructure to adequately drain the neighborhood’s low lying area. The additional outfall system will help contain flooding and improve public safety during major storms. 

Construction was completed in 2018. Read more about the project at denvergov.org/eastyalestorm


Glenbrook Stormwater Detention Basin 

A permanent flood protection stormwater detention facility for the Marston neighborhood in South Denver was completed in the city-owned natural area south of Garrison and Union Park. Denver Public Works and Denver Parks & Recreation coordinated park redesign and community review on this project that concluded in Summer 2018.

Read more about the work at the Glenbrook Stormwater Detention Basin


South Forest Street Outfall

This neighborhood drainage project increased the capacity of the existing storm sewer system in the Virginia Village neighborhood of southeast Denver to reduce flooding and protect the area upstream of Potenza Park. Planning for this general storm project started in 2012, with design completed and approved in 2016. Construction concluded in 2018.

Read more about the South Forest project