Martin Luther King, Jr. Blvd. Extension Project

Havana St. to Peoria St. 

 

The 1.1 mile extension of Martin Luther King Jr. Boulevard (MLK) from Havana Street east to Peoria Street is a planned transportation improvement within the Stapleton Redevelopment Area. The new roadway will extend mostly through the City and County of Denver, and a small portion will be located within the City of Aurora. The project consists of:

  • A new roadway between Havana St. and Peoria St. built to arterial standards, with two travel lanes and one parking lane in the east-bound direction, and two travel lanes in the west-bound direction.
  • A paved bicycle/pedestrian path and a soft-surface equestrian trail on the north side of MLK between Havana St. and Peoria St., separated from the roadway by a landscaped buffer.  
  • A raised median with landscaping between the east-bound and west-bound lanes.
  • A paved bicycle/pedestrian path on the south side of MLK between Havana St. and Peoria St., separated from the roadway by a tree lawn.
  • Reconstruction of Moline Street to 26th Avenue as a two-lane collector street.
  • Traffic signals at Kingston St., Moline St. and 26th Ave.; street lighting; and signage for a 35-mile per hour speed limit.
 
Project Status: Planning

The City and County of Denver prepared a Reevaluation of an earlier 2011 National Environmental Policy Act (NEPA) Environmental Assessment (EA). The Reevaluation was approved by CDOT and FHWA on June 21, 2017. Following a month-long public review and comment period that includes a public meeting, CDOT and FHWA may conclude the NEPA process with a Finding of No Significant Impact (FONSI). Upon approval of the FONSI, final design will be completed, permits secured and construction will begin.

 

Public Meeting: July 25, 2017

Thanks to all who attended the public meeting.

See the meeting presentation (PDF)

Public comments may be submitted through August 8. Send comments via email to Jane.Boand@denvergov.org, or by mail to 201 W. Colfax Ave., Dept. 509, Denver CO 80202.

Schedule

  • June 2017 — Approved NEPA EA Reevaluation by CDOT and FHWA
  • Late June – July 18 – Noise Wall Benefited Receptor Voting Process (affected property owners and residents only)
  • July 25 2017 - Public Meeting; see meeting details and comment information
  • Fall 2017 – Anticipated Finding of No Significant Impact (FONSI) by CDOT/FHWA
  • Fall/Winter 2017 — Final design plans completed and permits secured
  • Entire 2018 — Construction
 

Map highlighting MLK Blvd from Havana St to Peoria St, with inset illustration of typical section

MLK Project Area Map | see full-size rendering

 

Project Background

The Colorado Department of Transportation (CDOT) and the Federal Highway Administration (FHWA) prepared a National Environmental Policy Act (NEPA) Environmental Assessment (EA) in 2011. At that time, a Finding of No Significant Impact (FONSI) was not made by the CDOT and FHWA because funding was not available to construct the project. Since then, a combination of federal and local funding has been identified and the project is able to move forward. 

The City and County of Denver has prepared a NEPA EA Reevaluation of the project that was approved by CDOT and FHWA in June 2017. The NEPA EA Reevaluation updates the environmental analysis to reflect current site conditions as well as new CDOT/FHWA and other environmental requirements. Following a month-long public review and comment period that includes a public meeting, a Finding of No Significant Impact (FONSI) may be made by CDOT/FHWA and the project can proceed into final design, permitting and construction. 

Update Friday, July 21

The MLK Extension noise wall voting process is presumed to be completed as of 4:00 pm on 7/21/17; three days past the voting deadline at midnight 7/18/17. This additional time was to allow all mailed ballots to be received by CCD PW. The voting results are

NSA 3: 
Yes = 15 (27.3%)
No = 40 (72.7%)
71.4 % of possible votes cast

NSA 4:
Yes = 5 (12.8%)
No = 34 (87.2%)
75% of possible votes cast

NSA 6:
Yes = 9 (47.4%)
No = 10 (52.6%)
63.3% of possible votes cast

Documentation of the voting results will be mailed to all benefited receptors, and will be presented at the public meeting on Tuesday, July 25.


The noise analysis process conducted per requirements of the Colorado Department of Transportation (CDOT) “Noise Analysis and Abatement Guidelines, 2015” determined that noise abatement, in the form of noise walls, is both reasonable and feasible along three separate portions of the project on the south side of the new MLK Blvd. from Ironton St. to Moline St. Along these three blocks, adjacent property owners and residents (benefited receptors) will be asked to vote on their preference for, or against, the construction of a noise wall within their block. If a majority of benefited receptors vote to approve a noise wall within their block, Denver will construct a noise wall. If not, no wall(s) will be constructed. The voting process will conclude in mid-July and results will be posted on this webpage.

A short section of a demonstration noise wall has been constructed just west of Kingston St. along the new MLK alignment. There will be a site meeting and mock wall demonstration on July 5th from 4:30 to 6:30 pm to answer questions that voters may have.

A visual simulation ‘fly-through’ of the walls can be viewed online (one per block) and at the July 5 meeting.

Please note: these Autodesk links require an updated desktop browser with Flash enabled and may not work on mobile devices or older computers. Chrome or Firefox recommended.

The data may take several minutes to load, depending on connection speed. Once the model has loaded, you can interact with the static model, or view an animated for the noise wall by clicking the "movie" icon in the upper left of the page. Select the "story board" for that block to begin the animation. While the animation plays, you can toggle the noise walls on and off to see the perspective with and without the wall using the “Layers” control located next to the Story Board icon. Check the barriers box on/off while the animation is running.

 
Contacts

Jane Boand, Senior City Planner
Denver Public Works
jane.boand@denvergov.org | 720-865-3168

Jim Geist, Senior Engineer
Denver Public Works
james.geist@denvergov.org | 720-913-4504

Trevor Greco, Project Manager
AECOM
trevor.greco@aecom.com | 303-740-3820

Dennis Arbogast, Program Manager
AECOM
dennis.arbogast@aecom.com | 303-796-4751