Construction Photos - clockwise from upper left:
Construction photos (left to right):
Construction photos (left to right):
"Home of the 39th Avenue Greenway” sign located at 39th and York
Construction photos (left to right):
As a part of the construction of the 39th Avenue Greenway project, Crews will place 166 culvert boxes (10’ x 8’) between Blake and Franklin Streets along 40th Avenue. Each culvert box weighs approximately 20 tons and are designed to carry stormwater out of the area during flooding. This video shows the placement of one of those box culverts on the project in mid-October.