June 2020

 

April 2020

Construction Photos - clockwise from upper left:

  • Looking west at the High Street Bridge. This iconic bridge design was selected by the community.
  • Looking east towards High Street, at planter boxes, which will hold trees and plants and aid in water drainage. Next to the planter is construction of one of two nature play areas on the greenway – amenities requested by the community.
  • Construction of the bird’s nest feature at the High Street nature play area.
  • Looking east at the new Williams Street Plaza. Forming up the back wall of a new planter.

Looking west at the High Street Bridge.  

Forming up the back wall of a new planter. 

 

Looking east towards High Street at planter boxes 

 

 
 

Construction of the Shared Street - February 2020

Construction photos (left to right):

  • Looking east towards Williams Street.
  • Looking west towards Franklin Street.
  • Looking east from the Franklin Outfall.  The shared street is to the left of the concrete wall.
  • Looking east down the shared street.  Concrete planters are on the right.

Looking east toward Williams Street 

Looking west toward Franklin Street 

 

Looking east from the Franklin Outfall 

Looking east down the shared street 

 
 

February 2020

Construction photos (left to right):

  • Looking north, at installation of the Gilpin Street pedestrian bridge.
  • Looking east towards the High Street pedestrian bridge. Crews are placing the iconic arched design in place.
  • Looking west at the York Street vehicular bridge.
  • Northeast view of the Williams Street vehicular bridge.

Looking north, at installation of the Gilpin Street pedestrian bridge 

Looking east towards the High Street pedestrian bridge, crews are placing the iconic arched design in place 

 

 

 

 
 

Fall 2019

Construction Highlights (click to enlarge)

map of project with photo callouts from different locations along the greenway 

map of project with photo callouts from different locations along the greenway 

 

map of project with photo callouts from different locations along the greenway 

map of project with photo callouts from different locations along the greenway 

 
 
 

June 2019

construction area sign with details about future greenway project 

"Home of the 39th Avenue Greenway” sign located at 39th and York

 

February 2019

Construction photos (left to right):

  • Leveling and preparing the ground to place additional stormwater culverts under Blake and 40th Street
  • Aerial view showing where the new stormwater drainage system will connect to the existing system.
  • New concrete paving at Blake and 40th Street.

 

 

 

 

 

October 2018

As a part of the construction of the 39th Avenue Greenway project, Crews will place 166 culvert boxes (10’ x 8’) between Blake and Franklin Streets along 40th Avenue. Each culvert box weighs approximately 20 tons and are designed to carry stormwater out of the area during flooding. This video shows the placement of one of those box culverts on the project in mid-October.