43rd Avenue and Sherman Street Storm Drain

 

This project is the construction of a new storm drain at the intersection of 43rd Avenue and Sherman Street in the Globeville neighborhood.  This intersection has long been prone to ponding and flooding and has received numerous neighborhood complaints.  The new storm pipe will be built in Sherman Street and connect to an existing undersized storm system at 44th Avenue and Sherman Street.  The project was identified in the 2014 storm water master plan and is compatible with planned future upgrades to the storm infrastructure in the area.

Construction Complete!

Final paving is scheduled to be completed on Friday, August 23. The area should see improved storm drainage during heavy storms. 

Thank you for your patience during construction!

Location

  • Sherman Street between 43rd and 44th Avenues in Globeville

Additional features

  • Construction of street curb and gutter on Sherman Street south of the intersection with 43rd Avenue. The new curb and gutter will be located both on the residential (west) side of Sherman Street and the railroad (east) side of the street. 
  • A new swale (low ditch) behind the curb on the southeast corner of 43rd Avenue and Sherman Street will prevent storm water from spilling into the intersection.
 

map of project area south of I 70 and east of I 25 

 
 
Project Status: Construction Complete

Construction began in Spring 2019 and was completed in August 2019.

  • Planning: 2016
  • Design: 2017
  • Construction: 2019

Council District: 9

Neighborhood: Globeville

standing water flooding the roadway with houses in background 

Project Contacts

Project Hotline: 720-460-9055

ccd.constructionupdates@gmail.com

Contractor: Duran Excavating, Inc.
Josh Duran, joshd@duranexcavating.com
970-351-0192 | 303-539-1420

City Inspector: Rand Peterson